Grid connection · Scotland, United Kingdom

Cruach Mor grid connection

Cruach Mor grid connection is a grid connection in Scotland, United Kingdom, with 27.6 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCRUACH MOR grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Dunoon Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toDunoon Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity27.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.0001, -5.1121SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Cruach Mor grid connection is the 476th-largest of 1,192 grid connections in Scotland and the 1,450th-largest of 3,903 in the United Kingdom by capacity; its 27.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland476th of 1,19288,894 MW<0.1%
United Kingdom1,450th of 3,903446,745 MW<0.1%
All grid connections in our data4,703rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 180 power plants (42 operating, 901 MW) and 49 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
StrivenPower plant8 MWOperating1.2 km
Ardtaraig Wind FarmPower plant29.4 MWCancelled3.7 km
Stronafian Community Forest Wind TurbinesPower plant1.6 MWCancelled4.4 km
Glendaruel PrimarySubstation——7.5 km
Colintraive PrimarySubstation——8.6 km
Sandbank PrimarySubstation——9.3 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page