Grid connection · Scotland, United Kingdom

9.9MW Export grid connection

9.9MW Export grid connection is a planned grid connection in Scotland, United Kingdom, with 29.8 MW of capacity, connected by Scottish Hydro Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the source9.9MW EXPORT grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Inverness)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toInverness GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity29.8 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date16 Apr 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.4813, -4.1856SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

9.9MW Export grid connection is the 457th-largest of 1,192 grid connections in Scotland and the 1,414th-largest of 3,903 in the United Kingdom by capacity; its 29.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland457th of 1,19288,894 MW<0.1%
United Kingdom1,414th of 3,903446,745 MW<0.1%
All grid connections in our data4,660th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 142 power plants (44 operating, 1,870 MW) and 61 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Raigmore PrimarySubstation——1.1 km
Culloden PrimarySubstation——2.2 km
Longman Drive PrimarySubstation——2.3 km
Highland Wind Farm - Battery StoragePower plant30 MWPlanned2.5 km
Highland Wind Farm - Wind FarmPower plant133 MWPlanned2.5 km
Longman Landfill, Stadium Road - Solar ArrayPower plant9.9 MWPlanned2.8 km

Grid operator and place

More from Scottish Hydro Electric Power Distribution plc

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page