Grid connection · Scotland, United Kingdom

49.5MW - Battery grid connection

49.5MW - Battery grid connection is a planned grid connection in Scotland, United Kingdom, with 49.5 MW of capacity, held by Low Carbon Alliance.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the source49.5MW - BATTERY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Keith Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderLow Carbon AllianceSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toElectricity Substation, Westerton Road - Battery Storage (matched by coordinates+technology+capacity, 0.2 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toKeith Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity49.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date11 Jun 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.5430, -2.9298SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Electricity Substation, Westerton Road - Battery Storage (planning authority Moray, reference 22/01488/APP)
  2. Permit applied for: Electricity Substation, Westerton Road - Battery Storage (planning authority Moray, reference 22/01488/APP)

How it compares

49.5MW - Battery grid connection is the 297th-largest of 1,192 grid connections in Scotland and the 1,008th-largest of 3,903 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland297th of 1,19288,894 MW<0.1%
United Kingdom1,008th of 3,903446,745 MW<0.1%
All grid connections in our data4,383rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 176 power plants (58 operating, 1,740 MW) and 48 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Electricity Substation, Westerton Road - Battery StoragePower plant49.9 MWPermitted0.2 km
Drum Farm - Battery Energy Storage SystemPower plant49.9 MWPermitted0.3 km
Keith 2 GSPSubstation——0.5 km
Keith 1 GSPSubstation——0.6 km
Keith PrimarySubstation——0.6 km
Gibson Farm, Blackhillock - Battery Energy Storage SystemPower plant349 MWPermitted1.2 km

Holder, grid operator and place

More from Low Carbon Alliance

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page