49.5MW - Battery grid connection is a planned grid connection in Scotland, United Kingdom, with 49.5 MW of capacity, held by Low Carbon Alliance.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | 49.5MW - BATTERY grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | Scotland (connects at Keith Grid) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Low Carbon Alliance | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Electricity Substation, Westerton Road - Battery Storage (matched by coordinates+technology+capacity, 0.2 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Attached to | Keith Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 49.5 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 11 Jun 2021 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2033 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 57.5430, -2.9298 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit granted: Electricity Substation, Westerton Road - Battery Storage (planning authority Moray, reference 22/01488/APP)
- Permit applied for: Electricity Substation, Westerton Road - Battery Storage (planning authority Moray, reference 22/01488/APP)
How it compares
49.5MW - Battery grid connection is the 297th-largest of 1,192 grid connections in Scotland and the 1,008th-largest of 3,903 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 297th of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 1,008th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 4,383rd of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 176 power plants (58 operating, 1,740 MW) and 48 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Electricity Substation, Westerton Road - Battery Storage | Power plant | 49.9 MW | Permitted | 0.2 km |
| Drum Farm - Battery Energy Storage System | Power plant | 49.9 MW | Permitted | 0.3 km |
| Keith 2 GSP | Substation | — | — | 0.5 km |
| Keith 1 GSP | Substation | — | — | 0.6 km |
| Keith Primary | Substation | — | — | 0.6 km |
| Gibson Farm, Blackhillock - Battery Energy Storage System | Power plant | 349 MW | Permitted | 1.2 km |
Holder, grid operator and place
More from Low Carbon Alliance
- Ford Oaks Solar & Green Infrastructure Facility30 MW · under construction
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.