Power plant · East Devon, England, United Kingdom

Ford Oaks Solar & Green Infrastructure Facility

Ford Oaks Solar & Green Infrastructure Facility is a power plant under construction in East Devon, England, United Kingdom, with 30 MW of capacity, operated by Low Carbon Alliance and Taiyo Power & Storage.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMarsh Green Farm Marsh Green, Exeter, EX5 2EUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Nov 2023 (permit 22/0990/MFUL, Town and Country Planning Act, issued by East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 May 2022 (ref. 22/0990/MFUL, East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Nov 2023 (granted, ref. 22/0990/MFUL, East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Jan 2023 (refused, ref. 22/0990/MFUL, East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Nov 2023 (appeal granted, ref. 22/0990/MFUL, East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow Carbon AllianceDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTaiyo Power & StorageDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area74.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7333, -3.3579DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Ford Oaks Solar & Green Infrastructure Facility is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174186,088 MW<0.1%
United Kingdom1,569th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 178 grid connections and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Great Houndbeare Farm, Oak Road, Aylesbeare EHV Connection grid connectionGrid connection——0.5 km
Niro Solar Farm grid connectionGrid connection——0.9 km
Strete Solar Farm, Rockbeare, Devon grid connectionGrid connection——1.6 km
Axminster GSPSubstation——31 km

Operators and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page