Worstead Lane Pv Farm grid connection
Worstead Lane Pv Farm grid connection is a grid connection in England, United Kingdom, with 5 MW of capacity, held by S4N Worsted.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at East Grinstead 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | S4N Worsted | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | East Grinstead 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Worsted Farm (matched by coordinates+technology+capacity+company, 0.51 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 5 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 16 Apr 2019 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.1229, 0.0121 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Worsted Farm
- Permit granted: Worsted Farm (appeal granted, planning authority Mid Sussex, reference DM/15/3056)
- Permit granted: Worsted Farm (planning authority Mid Sussex, reference DM/15/3056)
- Permit refused: Worsted Farm (planning authority Mid Sussex, reference DM/15/3056)
- Permit applied for: Worsted Farm (planning authority Mid Sussex, reference DM/15/3056)
How it compares
Worstead Lane Pv Farm grid connection is the 2,306th-largest of 3,539 grid connections in England and the 3,191st-largest of 4,870 in the United Kingdom by capacity; its 5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,306th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 3,191st of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,884th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 412 substations, 262 power plants (104 operating, 2,150 MW) and 74 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Worsted Farm | Power plant | 5 MW | Operating | 0.5 km |
| East Grinstead 11kV | Substation | — | — | 2.0 km |
| Dormansland Grid 33kV | Substation | — | — | 3.0 km |
| Forest Row 11kV | Substation | — | — | 3.3 km |
| Goldman Sachs data center, East Grinstead | Data center | — | — | 4.0 km |
| Land at Barrow Green Farm | Power plant | 5 MW | Cancelled | 6.5 km |
| Haxted Mead, Lingfield - Solar Farm | Power plant | 50 MW | Planned | 7.7 km |
| Digital Realty LGW15 | Data center | — | — | 13 km |
| 4D Data Centers - Gatwick | Data center | — | — | 13 km |
Holder, grid operator and place
More from S4N Worsted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.