Power plant · Tandridge, England, United Kingdom

Land at Barrow Green Farm

Land at Barrow Green Farm is a cancelled solar power plant in Tandridge, England, United Kingdom, with 5 MW of capacity, operated by Dowsett Mayhew Planning Partnership.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTandridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at Barrow Green Farm, Haxted Road, Lingfield, RH7 6DEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Jan 2015 (reference 2015/57, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Feb 2015 (refused, reference 2015/57, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDowsett Mayhew Planning Partnership (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area23.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1814, 0.0068DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Tandridge, reference 2015/57)
  2. Permit applied for (planning authority Tandridge, reference 2015/57)

How it compares

Land at Barrow Green Farm is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 93 data centers, 56 substations, 19 grid connections (10 operating, 78.4 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Goldman Sachs data center, East GrinsteadData center——6.1 km
Restore Records ManagementData center——12 km
Unit 3Data center——14 km
Five Oaks PrimarySubstation——33 km
Solar 3.905 MW grid connection at Five Oaks Farm PVGrid connection3.91 MWOperating35 km
Billingshurst PrimarySubstation——37 km
Malham Farm Solar & Storage grid connectionGrid connection20 MWPlanned38 km
Tertiary Study grid connectionGrid connection57 MWPlanned38 km
Hope And Anchor PrimarySubstation——39 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page