Grid connection · England, United Kingdom

West Woodlands PV grid connection

West Woodlands PV grid connection is a grid connection in England, United Kingdom, with 3.88 MW of capacity, held by Sunsave 24 (West Woodlands) Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceWEST WOODLANDS PV grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at West Woodland PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderSunsave 24 (West Woodlands) LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toWest Woodlands (matched by name+coordinates+technology+company, 0.3 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toFrome BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity3.88 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.1942, -2.3197SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: West Woodlands
  2. Permit granted: West Woodlands (appeal granted, planning authority Somerset, reference 2014/2326/FUL)
  3. Permit granted: West Woodlands (planning authority Somerset, reference 2014/2326/FUL)
  4. Permit refused: West Woodlands (planning authority Somerset, reference 2014/2326/FUL)
  5. Permit applied for: West Woodlands (planning authority Somerset, reference 2014/2326/FUL)

How it compares

West Woodlands PV grid connection is the 1,886th-largest of 2,533 grid connections in England and the 2,918th-largest of 3,903 in the United Kingdom by capacity; its 3.88 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,886th of 2,533319,370 MW<0.1%
United Kingdom2,918th of 3,903446,745 MW<0.1%
All grid connections in our data6,910th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 403 power plants (175 operating, 2,775 MW), 86 substations, 5 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Court Farm (Frome)Power plant6.8 MWCancelled0.3 km
West WoodlandsPower plant5 MWOperating0.3 km
Monksham Solar FarmPower plant10.7 MWOperating1.4 km
Frome BSPSubstation——4.2 km
Frome PrimarySubstation——4.3 km
Holwell PrimarySubstation——5.6 km
Data center, England (OSM way 996865179)Data center——26 km
Ark Data CentresData center——26 km
Hinkley Point C ConnectionTransmission line—Permitted35 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page