Power plant · Somerset, England, United Kingdom

Court Farm (Frome)

Court Farm (Frome) is a cancelled solar power plant in Somerset, England, United Kingdom, with 6.8 MW of capacity, operated by Sunsave 24.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFarm West Woodlands, Frome, BA11 5ENDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 May 2014 (reference 2014/0852/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Aug 2015 (appeal refused, reference 2014/0852/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Aug 2014 (refused, reference 2014/0852/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSunsave 24 (Sunsave 24 (West Woodlands) Limited, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.88 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1952, -2.3157DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Somerset, reference 2014/0852/FUL)
  2. Permit refused (planning authority Somerset, reference 2014/0852/FUL)
  3. Permit applied for (planning authority Somerset, reference 2014/0852/FUL)

How it compares

Court Farm (Frome) is the 1,932nd-largest of 4,036 power plants in England and the 2,973rd-largest of 5,837 in the United Kingdom by capacity; its 6.8 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,932nd of 4,036134,406 MW<0.1%
United Kingdom2,973rd of 5,837200,833 MW<0.1%
All power plants in our data8,695th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 161 grid connections (99 operating, 911 MW), 86 substations, 5 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
West Woodlands PV grid connectionGrid connection3.88 MWOperating0.3 km
Monksham Solar Park grid connectionGrid connection7.6 MWOperating1.2 km
Unit A1 Marston Trading Estate grid connectionGrid connection2.41 MWOperating3.0 km
Frome BSPSubstation——4.0 km
Frome PrimarySubstation——4.1 km
Holwell PrimarySubstation——5.9 km
Data center, England (OSM way 996865179)Data center——26 km
Ark Data CentresData center——26 km
Hinkley Point C ConnectionTransmission line—Permitted35 km

Operator and place

More from Sunsave 24

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page