Grid connection · England, United Kingdom

Waste 30 MW grid connection at Sandall Stones W2E

Waste 30 MW grid connection at Sandall Stones W2E is a planned grid connection in England, United Kingdom, with 30 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Sandall Stones W2E)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toBH Energy Gap - Energy Recovery Facility (matched by coordinates+technology+capacity, 0.4 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toDoncaster B/Thorpe Marsh (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity30 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWasteNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date18 May 2020Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.5588, -1.0801Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: BH Energy Gap - Energy Recovery Facility (planning authority Doncaster, reference 20/01774/TIPA)
  2. Permit applied for: BH Energy Gap - Energy Recovery Facility (planning authority Doncaster, reference 20/01774/TIPA)

How it compares

Waste 30 MW grid connection at Sandall Stones W2E is the 857th-largest of 2,533 grid connections in England and the 1,333rd-largest of 3,903 in the United Kingdom by capacity; its 30 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England857th of 2,533319,370 MW<0.1%
United Kingdom1,333rd of 3,903446,745 MW<0.1%
All grid connections in our data4,846th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 521 power plants (149 operating, 4,364 MW), 317 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kirk SandallSubstation——0.3 km
BH Energy Gap - Energy Recovery FacilityPower plant34 MWPermitted0.4 km
RockwareSubstation——0.6 km
Fordtead Lane, Thorpe Marsh - Battery Energy FacilityPower plant180 MWPermitted2.0 km
Fenwick Solar Farm & Battery StoragePower plant238 MWPermitted2.4 km
Markham GatesSubstation——2.5 km
ThalesData center——6.4 km
North Humber to High MarnhamTransmission line—Planned18 km
HSBC Wakefield Data CentreData center——25 km