Waste 19 MW grid connection at Monckton Road Diesel Generation
Waste 19 MW grid connection at Monckton Road Diesel Generation is a grid connection in England, United Kingdom, with 19 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connection site: Monckton Road Diesel Generation) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Operating (Connected) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Wakefield Monckton Road (via: bsp) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 19 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Waste | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Mar 2011 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.6671, -1.5071 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its grid operator? Ask us.
How it compares
Waste 19 MW grid connection at Monckton Road Diesel Generation is the 1,108th-largest of 2,533 grid connections in England and the 1,762nd-largest of 3,903 in the United Kingdom by capacity; its 19 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,108th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,762nd of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,244th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 431 power plants (124 operating, 4,199 MW), 361 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wakefield Monckton Road | Substation | — | — | 0.2 km |
| Denby Dale Road | Substation | — | — | 0.3 km |
| Woodcock Street | Substation | — | — | 1.4 km |
| Neil Fox Way - Battery Storage | Power plant | 99.9 MW | Planned | 2.8 km |
| Neil Fox Way - Battery Storage | Power plant | 99.9 MW | Planned | 2.8 km |
| Owlers Farm, Wakefield Road - Solar Farm | Power plant | 20 MW | Permitted | 4.5 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 30 km |
| North Humber to High Marnham | Transmission line | — | Planned | 48 km |
Grid operator and place
More from Northern Powergrid (Yorkshire) plc
- Battery storage and Solar and Wind 394.6 MW grid connection at Elm Tree Hybrid Direct395 MW
- Solar 320 MW grid connection at Creyke Beck Solar Direct320 MW
- Battery storage and Solar and Wind 299.7 MW grid connection at Little Becks Hybrid Direct300 MW
- Wind 240 MW grid connection at Calderdale Wind Farm Direct240 MW
- Battery storage 240 MW grid connection at NEL Conway2 BESS Direct240 MW
- Battery storage 240 MW grid connection at NEL Suggit BESS Direct240 MW
- Springfield Farm grid connection240 MW
- Springfield Farm grid connection240 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.