Waste 16.5 MW grid connection at Leeds Waste to Energy

Waste 16.5 MW grid connection at Leeds Waste to Energy is a grid connection in England, United Kingdom, with 16.5 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Leeds Waste to Energy)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toLeeds East (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity16.5 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWasteNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Jan 2016Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.8026, -1.5064Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Waste 16.5 MW grid connection at Leeds Waste to Energy is the 1,158th-largest of 2,533 grid connections in England and the 1,834th-largest of 3,903 in the United Kingdom by capacity; its 16.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,158th of 2,533319,370 MW<0.1%
United Kingdom1,834th of 3,903446,745 MW<0.1%
All grid connections in our data5,630th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 394 substations, 385 power plants (103 operating, 3,918 MW), 11 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Leeds EastSubstation——0.2 km
York RoadSubstation——0.4 km
BurmantoftsSubstation——1.5 km
Cross Green ERFPower plant11.6 MWOperating1.5 km
Premier Farnell, Unit 3 - Solar PanelsPower plant2.28 MWPermitted2.2 km
Pollington Energy ParkPower plant53 MWCancelled2.4 km
GridJetData center——4.9 km
nLighten LeedsData center——14 km
HSBC Wakefield Data CentreData center——14 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom