Power plant · Rushmoor, England, United Kingdom

Farnborough International Exhibition Centre, Etps Road - Solar Panels

Farnborough International Exhibition Centre, Etps Road - Solar Panels is a power plant under construction in Rushmoor, England, United Kingdom, with 1.15 MW of capacity, operated by Farnborough International Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRushmoor (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFarnborough International Exhibition & Conference Centre, Etps Road, Farnborough, GU14 6TQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Feb 2024 (permit 23/00885/FULPP, Town and Country Planning Act, issued by Rushmoor)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Dec 2023 (ref. 23/00885/FULPP, Rushmoor)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Feb 2024 (granted, ref. 23/00885/FULPP, Rushmoor)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFarnborough International LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1.66 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2783, -0.7558DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Farnborough International Exhibition Centre, Etps Road - Solar Panels is the 2,042nd-largest of 2,174 power plants planned, permitted or under construction in England and the 3,050th-largest of 3,222 in the United Kingdom by capacity; its 1.15 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,042nd of 2,174186,088 MW<0.1%
United Kingdom3,050th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,282nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 224 substations, 159 grid connections (89 operating, 917 MW), 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Farnboro Airfield PrimarySubstation——1.1 km
Farnborough PrimarySubstation——1.5 km
Queensmead PrimarySubstation——1.7 km
Solar 15.2 MW grid connection at Farnborough 2 GenerationGrid connection15.2 MWOperating3.2 km
Tillingham Power grid connectionGrid connection15.2 MWOperating3.2 km
Waste 2.28 MW grid connection at AldershotGrid connection2.28 MWOperating6.5 km
SDC M40 CampusData center—Planned36 km
Aquind InterconnectorTransmission line—Planned45 km