RARE CONTEXT Request research

Grid connection · England, United Kingdom

Vine Solar Farm grid connection

Vine Solar Farm grid connection is a grid connection in England, United Kingdom, with 45 MW of capacity, held by Emotion Energy Limited.

Map: where Vine Solar Farm grid connection lies
52.1090, -0.0637 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Wymondley)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEmotion Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toVine Farm Solar Park (matched by name+coordinates+technology+capacity, 0.33 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity45 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date5 Mar 2016UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1090, -0.0637UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Vine Farm Solar Park
  2. Permit granted: Vine Farm Solar Park (secretary of state granted, planning authority South Cambridgeshire, reference S/1067/14/FL)
  3. Permit applied for: Vine Farm Solar Park (planning authority South Cambridgeshire, reference S/1067/14/FL)

How it compares

Vine Solar Farm grid connection is the 860th-largest of 3,539 grid connections in England and the 1,223rd-largest of 4,870 in the United Kingdom by capacity; its 45 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England860th of 3,539341,715 MW<0.1%
United Kingdom1,223rd of 4,870467,981 MW<0.1%
All grid connections in our data4,437th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 411 power plants (163 operating, 3,728 MW), 175 substations, 16 data centers (1 operating, 88 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Vine Farm Solar ParkPower plant45 MWOperating0.3 km
Croydon Solar FarmPower plant5 MWCancelled1.2 km
Bassingbourn Barracks, Old North Road - Solar PV ArraysPower plant2.3 MWPermitted2.3 km
Croydon Primary 11kVSubstation——2.9 km
Melbourn Grid 33kVSubstation——5.6 km
Melbourn Primary 11kVSubstation——5.6 km
West Cambridge Data CentreData center——15 km
Starwood HouseData center——17 km
Redcentric CambridgeData center——20 km

Holder, grid operator and place

More from Emotion Energy Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page