Power plant · South Cambridgeshire, England, United Kingdom

Bassingbourn Barracks, Old North Road - Solar PV Arrays

Bassingbourn Barracks, Old North Road - Solar PV Arrays is a permitted solar power plant in South Cambridgeshire, England, United Kingdom, with 2.3 MW of capacity, operated by Defence Infrastructure Organisation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBassingbourn Barracks, Old North Road, Bassingbourn Cum Kneesworth, Royston, SG8 5LXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Jul 2024 (permit 24/00481/FUL, Town and Country Planning Act, issued by South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Feb 2024 (reference 24/00481/FUL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jul 2024 (granted, reference 24/00481/FUL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDefence Infrastructure Organisation (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0937, -0.0403DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority South Cambridgeshire, reference 24/00481/FUL)
  2. Permit applied for (planning authority South Cambridgeshire, reference 24/00481/FUL)

How it compares

Bassingbourn Barracks, Old North Road - Solar PV Arrays is the 1,410th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,239th-largest of 2,548 in the United Kingdom by capacity; its 2.3 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,410th of 1,650171,264 MW<0.1%
United Kingdom2,239th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,443rd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 18 data centers (1 operating, 88 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
West Cambridge Data CentreData center——15 km
Starwood HouseData center——17 km
Redcentric CambridgeData center——20 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating38 km

Operator and place

More from Defence Infrastructure Organisation

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page