Power plant · South Cambridgeshire, England, United Kingdom

Vine Farm Solar Park

Vine Farm Solar Park is a power plant in South Cambridgeshire, England, United Kingdom, with 45 MW of capacity, operated by Allianz.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressVine House, Vine Farm, High Street, Shingay Cum Wendy, Royston, SG8 0HJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date2 Sept 2014 (permit S/1067/14/FL, Town and Country Planning Act, issued by South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 May 2014 (reference S/1067/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Sept 2014 (secretary of state granted, reference S/1067/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAllianzDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity45 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area100 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1117, -0.0658DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Vine Farm Solar Park is the 281st-largest of 3,430 power plants in England and the 523rd-largest of 5,050 in the United Kingdom by capacity; its 45 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England281st of 3,43071,985 MW<0.1%
United Kingdom523rd of 5,050115,642 MW<0.1%
All power plants in our data2,085th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. S/1067/14/FL
  2. Started operating

Nearby

Within 50 km of this power plant: 40 grid connections and 16 data centers (1 operating, 88 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
West Cambridge Data CentreData center——15 km
Starwood HouseData center——17 km
Redcentric CambridgeData center——20 km
Chelveston, the Airfield grid connectionGrid connection——38 km
Chelveston Renewable Energy Park grid connectionGrid connection——38 km
Higham Park grid connectionGrid connection——38 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page