Grid connection · England, United Kingdom
Vause Farm grid connection
Vause Farm grid connection is a planned grid connection in England, United Kingdom, with 20 MW of capacity, held by EcoDev Group Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | VAUSE FARM grid connection | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Wrightington) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | EcoDev Group Limited | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Wrightington BSP (via a bulk supply point) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Vause Farm - Battery Storage (matched by name+coordinates+technology+capacity, 0.29 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 20 MW | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Electricity North West Limited | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 19 Jul 2021 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 53.6167, -2.6894 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit granted: Vause Farm - Battery Storage (planning authority Chorley, reference 22/00362/FULMAJ)
- Permit applied for: Vause Farm - Battery Storage (planning authority Chorley, reference 22/00362/FULMAJ)
How it compares
Vause Farm grid connection is the 1,020th-largest of 2,533 grid connections in England and the 1,645th-largest of 3,903 in the United Kingdom by capacity; its 20 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,020th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,645th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,244th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 402 power plants (123 operating, 1,615 MW), 357 substations, 17 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wrightington BSP | Substation | — | — | 0.2 km |
| Charnock Richard - Battery Storage | Power plant | 30 MW | Operating | 0.3 km |
| Vause Farm - Battery Storage | Power plant | 20 MW | Permitted | 0.3 km |
| Wrightington | Substation | — | — | 0.9 km |
| Thompson House Equestrian farm | Power plant | 5 MW | Operating | 2.1 km |
| Standish | Substation | — | — | 3.9 km |
| Data center, England (OSM way 1551100328) | Data center | — | — | 16 km |
| Verizon Warrington | Data center | — | — | 23 km |
| Iron Mountain | Data center | — | — | 23 km |
Holder, grid operator and place
More from EcoDev Group Limited
- Keithick Estate Solar, and Battery Storage Plant grid connection113 MW
- Bankside BESS grid connection50 MW
- 37.5MW GEN PV & Batt / 16MW Export grid connection37.5 MW
- Haughend Farm - Alyth Battery Energy Storage System900 MW · permitted
- Foxhounds Lane, Southfleet - Battery Storage300 MW
- Sunbury Battery Energy Storage System - Battery Energy Storage System200 MW · permitted
- Stirling Battery and Solar Energy Park60 MW · permitted
- Stirling Battery and Solar Energy Park50 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.