Grid connection · England, United Kingdom

Vause Farm grid connection

Vause Farm grid connection is a planned grid connection in England, United Kingdom, with 20 MW of capacity, held by EcoDev Group Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceVAUSE FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Wrightington)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderEcoDev Group LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toWrightington BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toVause Farm - Battery Storage (matched by name+coordinates+technology+capacity, 0.29 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity20 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date19 Jul 2021SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.6167, -2.6894SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Vause Farm - Battery Storage (planning authority Chorley, reference 22/00362/FULMAJ)
  2. Permit applied for: Vause Farm - Battery Storage (planning authority Chorley, reference 22/00362/FULMAJ)

How it compares

Vause Farm grid connection is the 1,020th-largest of 2,533 grid connections in England and the 1,645th-largest of 3,903 in the United Kingdom by capacity; its 20 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,020th of 2,533319,370 MW<0.1%
United Kingdom1,645th of 3,903446,745 MW<0.1%
All grid connections in our data5,244th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 402 power plants (123 operating, 1,615 MW), 357 substations, 17 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wrightington BSPSubstation——0.2 km
Charnock Richard - Battery StoragePower plant30 MWOperating0.3 km
Vause Farm - Battery StoragePower plant20 MWPermitted0.3 km
WrightingtonSubstation——0.9 km
Thompson House Equestrian farmPower plant5 MWOperating2.1 km
StandishSubstation——3.9 km
Data center, England (OSM way 1551100328)Data center——16 km
Verizon WarringtonData center——23 km
Iron MountainData center——23 km

Holder, grid operator and place

More from EcoDev Group Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom