Power plant · Wigan, England, United Kingdom

Thompson House Equestrian farm

Thompson House Equestrian farm is a power plant in Wigan, England, United Kingdom, with 5 MW of capacity, operated by Emotion Solar One.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWigan (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThompson House Equestrain Centre, Pepper Lane, Standish, WN6 0PPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Feb 2015 (permit A/14/79904/MAJOR, Town and Country Planning Act, issued by Wigan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Oct 2014 (reference A/14/79904/MAJOR, planning authority Wigan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Feb 2015 (granted, reference A/14/79904/MAJOR, planning authority Wigan)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEmotion Solar OneDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5985, -2.6812DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Thompson House Equestrian farm is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,758th of 3,43071,985 MW<0.1%
United Kingdom2,742nd of 5,050115,642 MW<0.1%
All power plants in our data8,356th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. A/14/79904/MAJOR
  2. Started operating

Nearby

Within 50 km of this power plant: 380 grid connections (209 operating, 1,829 MW), 17 data centers, 5 substations, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Thompson House Farm grid connectionGrid connection3.93 MWOperating0.0 km
Vause Farm grid connectionGrid connection20 MWPlanned2.1 km
Town Lane BESS grid connectionGrid connection30 MWPlanned2.2 km
Data center, England (OSM way 1551100328)Data center——14 km
Verizon WarringtonData center——20 km
Iron MountainData center——21 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted31 km
East Irish Sea Transmission ProjectTransmission line—Planned32 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled39 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page