Grid connection · Scotland, United Kingdom

37.5MW GEN PV & Batt / 16MW Export grid connection

37.5MW GEN PV & Batt / 16MW Export grid connection is a planned grid connection in Scotland, United Kingdom, with 37.5 MW of capacity, held by EcoDev Group Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the source37.5MW GEN PV & BATT / 16MW EXPORT grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Coupar Angus Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderEcoDev Group LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCoupar Angus Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity37.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date26 Oct 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Jun 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.5321, -3.2971SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

37.5MW GEN PV & Batt / 16MW Export grid connection is the 368th-largest of 1,192 grid connections in Scotland and the 1,214th-largest of 3,903 in the United Kingdom by capacity; its 37.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland368th of 1,19288,894 MW<0.1%
United Kingdom1,214th of 3,903446,745 MW<0.1%
All grid connections in our data4,683rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 265 power plants (63 operating, 968 MW) and 75 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Mains Of Keithick Farm, Keithick - Battery Storage & Solar FarmPower plant20.5 MWPermitted0.2 km
Mains Of Keithick Farm, Keithick - Battery Storage & Solar FarmPower plant16 MWPermitted0.2 km
Stirling Battery and Solar Energy ParkPower plant60 MWPermitted0.2 km
Coupar Angus PrimarySubstation——1.6 km
Coupar Angus GSPSubstation——1.6 km
Blairgowrie PrimarySubstation——6.2 km

Holder, grid operator and place