Grid connection · England, United Kingdom

Stort Solar Farm grid connection

Stort Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 35 MW of capacity, held by East End Solar Farm Limited.

Map: where Stort Solar Farm grid connection lies
51.7715, 0.0486 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Harlow West Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEast End Solar Farm LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity35 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date30 Jun 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2031 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7715, 0.0486UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Stort Solar Farm grid connection is the 1,015th-largest of 3,539 grid connections in England and the 1,445th-largest of 4,870 in the United Kingdom by capacity; its 35 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,015th of 3,539341,715 MW<0.1%
United Kingdom1,445th of 4,870467,981 MW<0.1%
All grid connections in our data4,735th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 529 substations, 423 power plants (152 operating, 4,839 MW), 95 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
East End Solar FarmPower plant49.9 MWPermitted0.2 km
Harlow West Grid 11kVSubstation——1.5 km
Harlow West Grid 33kVSubstation——1.6 km
Poundland Distribution Centre - Solar Photovoltaic SystemPower plant1.5 MWCancelled1.7 km
Rye Meads Sewerage Treatment WorksPower plant2.3 MWOperating2.0 km
Hoddesdon Primary 11kVSubstation——2.8 km
Kao Data KLON-01Data center——5.6 km
Kao Data KLON-02Data center——5.6 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating5.7 km

Holder, grid operator and place

More from East End Solar Farm Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom