Data center · England, United Kingdom

Kao Data KLON-01

Kao Data KLON-01 is a data center in England, United Kingdom, operated by Kao Data.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorKao DataOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint4,111 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.7692, 0.1293OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Kao Data operates 4 of the 191 data centers in the United Kingdom in our data with a named owner; 9 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
Kao Data10th42.1%

Nearby

Within 50 km of this data center: 397 power plants (144 operating, 2,654 MW), 35 substations, 6 grid connections (3 operating, 18.6 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
NVIDIA Cambridge-1AI supercomputer202 H100eOperating0.2 km
Poundland Distribution Centre - Solar Photovoltaic SystemPower plant1.5 MWPermitted3.9 km
Upland Road - 49.9 Megawatt Solar PanelsPower plant49.9 MWCancelled5.1 km
East End Solar FarmPower plant49.9 MWPermitted5.8 km
North London (Electricity Line) ReinforcementTransmission line—Permitted22 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating31 km
Tertiary Study grid connectionGrid connection57 MWPlanned32 km
Willesden GSPSubstation——37 km
Volt Avenue PrimarySubstation——37 km

Operator and place

More from Kao Data

Other data centers in England

All 245 data centers in England, United Kingdom