Power plant · East Hertfordshire, England, United Kingdom

Rye Meads Sewerage Treatment Works

Rye Meads Sewerage Treatment Works is a biomass power plant in East Hertfordshire, England, United Kingdom, with 2.3 MW of capacity, operated by Thames Water.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Hertfordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRye Meads STW, Stanstead Abbots, Nr Ware, SG12 8JYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 May 2014 (reference 3/14/0768/FP, planning authority East Hertfordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorThames WaterDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7753, 0.0203DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit applied for (planning authority East Hertfordshire, reference 3/14/0768/FP)

How it compares

Rye Meads Sewerage Treatment Works is the 3,217th-largest of 4,035 power plants in England and the 4,694th-largest of 5,834 in the United Kingdom by capacity; its 2.3 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,217th of 4,035134,434 MW<0.1%
United Kingdom4,694th of 5,834200,500 MW<0.1%
All power plants in our data13,826th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 96 data centers (1 operating, 88 MW), 56 substations, 20 grid connections (11 operating, 96.2 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kao Data KLON-02Data center——7.5 km
Kao Data KLON-01Data center——7.5 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating7.7 km
Google Datacentre Waltham CrossData center——10 km
North London (Electricity Line) ReinforcementTransmission line—Permitted20 km
Tertiary Study grid connectionGrid connection57 MWPlanned29 km
Willesden GSPSubstation——33 km
Canal Bank 11kV PrimarySubstation——33 km
Canal Bank 6.6kV PrimarySubstation——33 km

Operator and place

More from Thames Water

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page