Solar 9.2 MW grid connection at Dunkeswick

Solar 9.2 MW grid connection at Dunkeswick is a planned grid connection in England, United Kingdom, with 9.2 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Dunkeswick)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDunkeswick (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity9.2 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date10 Feb 2025Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.9193, -1.5331Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Solar 9.2 MW grid connection at Dunkeswick is the 1,394th-largest of 2,533 grid connections in England and the 2,203rd-largest of 3,903 in the United Kingdom by capacity; its 9.2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,394th of 2,533319,370 MW<0.1%
United Kingdom2,203rd of 3,903446,745 MW<0.1%
All grid connections in our data5,824th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 324 power plants (85 operating, 3,639 MW), 285 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
DunkeswickSubstation——0.1 km
Juniper Farm, Main Street - BESSPower plant10 MWPlanned2.6 km
Juniper Farm, Main Street - Solar FarmPower plant18.8 MWPlanned2.6 km
OatlandsSubstation——6.4 km
BramhopeSubstation——7.3 km
Kellingley Farm, Stocking Lane - Battery Energy StoragePower plant240 MWPlanned8.5 km
Yorkshire GREENTransmission line—Permitted17 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom