Grid connection · England, United Kingdom

Solar 86 MW grid connection at Low Farm Wakefield Direct

Solar 86 MW grid connection at Low Farm Wakefield Direct is a planned grid connection in England, United Kingdom, with 86 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Low Farm Wakefield Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSkelton Grange (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity86 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date31 Mar 2021Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.6396, -1.6349Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Solar 86 MW grid connection at Low Farm Wakefield Direct is the 400th-largest of 2,533 grid connections in England and the 526th-largest of 3,903 in the United Kingdom by capacity; its 86 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England400th of 2,533319,370 MW<0.1%
United Kingdom526th of 3,903446,745 MW<0.1%
All grid connections in our data3,461st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 539 substations, 440 power plants (129 operating, 4,099 MW), 19 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Low Farm, Flockton - Solar Photovoltaic FarmPower plant49.9 MWPermitted0.7 km
New Hall Farm, New Hall Lane - Solar FarmPower plant22.4 MWPermitted1.8 km
Denby GrangeSubstation——2.8 km
Lady Ings Farm, Middlestown - Solar Photovoltaic FarmPower plant49.9 MWPermitted3.6 km
Thornhill 132kVSubstation——4.4 km
Calder WharfSubstation——4.6 km
Redcentric Elland Data CentreData center——14 km
GridJetData center——16 km
nLighten LeedsData center——17 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page