Solar 4.75 MW grid connection at Herriard
Solar 4.75 MW grid connection at Herriard is a grid connection in England, United Kingdom, with 4.75 MW of capacity, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Solar 4.75 MW grid connection at HERRIARD | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Herriard) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Herriard Primary (via a primary substation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Frying Down Copse Solar Farm (matched by coordinates+technology+capacity, 0.46 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 4.75 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.2161, -1.0604 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Commissioned: Frying Down Copse Solar Farm
- Permit granted: Frying Down Copse Solar Farm (planning authority Basingstoke and Deane, reference BDB/73851)
- Permit applied for: Frying Down Copse Solar Farm (planning authority Basingstoke and Deane, reference BDB/73851)
How it compares
Solar 4.75 MW grid connection at Herriard is the 1,714th-largest of 2,533 grid connections in England and the 2,662nd-largest of 3,903 in the United Kingdom by capacity; its 4.75 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,714th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,662nd of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 6,637th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 282 power plants (107 operating, 991 MW), 265 substations, 68 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Green Waste Composting Facility (Waste AD) | Power plant | 1.2 MW | Operating | 0.2 km |
| Frying Down Copse Solar Farm | Power plant | 5 MW | Operating | 0.5 km |
| Herriard Primary | Substation | — | — | 2.1 km |
| Jays Close Primary | Substation | — | — | 4.3 km |
| Carousel Dairy AD Plant (Farm AD) | Power plant | 1.5 MW | Operating | 4.6 km |
| Down Grange Primary | Substation | — | — | 5.4 km |
| Data center, England (OSM way 1164817477) | Data center | — | — | 20 km |
| Ark Data Centres data center, England | Data center | — | — | 20 km |
| Datum Farnborough Data Centre | Data center | — | — | 20 km |
Grid operator and place
More from Southern Electric Power Distribution plc
- Weston Lane (G) grid connection450 MW
- 200MW BESS grid connection200 MW
- 200MW BESS grid connection200 MW
- Ready - 200MW Battery grid connection200 MW
- Witney Bypass - 150MW BESS grid connection160 MW
- Norrington Gate Battery 150MW grid connection150 MW
- Stonehill grid connection150 MW
- Fawley North Cogeneration Connection grid connection138 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.