Grid connection · England, United Kingdom

Solar 2 MW grid connection at South Elmsall

Solar 2 MW grid connection at South Elmsall is a grid connection in England, United Kingdom, with 2 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at South Elmsall)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSouth Elmsall (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toElmsall Way Warehouse (matched by coordinates+technology+capacity, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity2 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date11 Sept 2020Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date10 May 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.6039, -1.2701Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Elmsall Way Warehouse
  2. Permit granted: Elmsall Way Warehouse (planning authority Wakefield, reference 19/02744/FUL)
  3. Permit applied for: Elmsall Way Warehouse (planning authority Wakefield, reference 19/02744/FUL)

How it compares

Solar 2 MW grid connection at South Elmsall is the 2,165th-largest of 2,533 grid connections in England and the 3,341st-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,165th of 2,533319,370 MW<0.1%
United Kingdom3,341st of 3,903446,745 MW<0.1%
All grid connections in our data7,347th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 486 power plants (142 operating, 11,265 MW), 369 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Elmsall Way, South Elmsall - Solar PanelsPower plant3 MWUnder construction0.1 km
Finlay Beverages, Elmsall Way - Solar PanelsPower plant1.65 MWPermitted0.1 km
Elmsall Way WarehousePower plant2.4 MWOperating0.2 km
South ElmsallSubstation——2.3 km
South KirkbySubstation——4.2 km
BrodsworthSubstation——5.8 km
HSBC Wakefield Data CentreData center——13 km
nLighten LeedsData center——14 km
ThalesData center——15 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page