Grid connection · England, United Kingdom

Solar 1.999 MW grid connection at Weeland Road

Solar 1.999 MW grid connection at Weeland Road is a grid connection in England, United Kingdom, with 2 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Weeland Road)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (Connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toKnottingley B (method: coordinates+technology+capacity, distance km: 0.28)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toWeeland Road (via: primary)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity2 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Mar 2016Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7060, -1.2407Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Solar 1.999 MW grid connection at Weeland Road is the 2,205th-largest of 2,533 grid connections in England and the 3,404th-largest of 3,903 in the United Kingdom by capacity; its 2 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,205th of 2,533319,370 MW<0.1%
United Kingdom3,404th of 3,903446,745 MW<0.1%
All grid connections in our data7,100th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 440 power plants (120 operating, 4,247 MW), 377 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Weeland RoadSubstation——0.1 km
Knottingley APower plant5 MWOperating0.3 km
Knottingley BPower plant2.4 MWOperating0.3 km
Knottingley Power ProjectPower plant1,500 MWPermitted0.6 km
BealSubstation——2.0 km
Ferrybridge ASubstation——2.5 km
Yorkshire GREENTransmission line—Permitted22 km
North Humber to High MarnhamTransmission line—Planned37 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page