Grid connection · England, United Kingdom

Shore Top Farm BESS grid connection

Shore Top Farm BESS grid connection is a planned grid connection in England, United Kingdom, with 11 MW of capacity, connected by Electricity North West Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSHORE TOP FARM BESS grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Radcliffe)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toRadcliffe BSP (via a primary substation)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toShore Top Farm, Kearsley Road - Battery Energy Storage (matched by shared name+coordinates+technology+capacity, 0.58 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity11 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date1 Dec 2021SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.5510, -2.3388SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Shore Top Farm, Kearsley Road - Battery Energy Storage (planning authority Bury, reference 71888)
  2. Permit applied for: Shore Top Farm, Kearsley Road - Battery Energy Storage (planning authority Bury, reference 71888)

How it compares

Shore Top Farm BESS grid connection is the 1,313th-largest of 2,533 grid connections in England and the 2,074th-largest of 3,903 in the United Kingdom by capacity; its 11 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,313th of 2,533319,370 MW<0.1%
United Kingdom2,074th of 3,903446,745 MW<0.1%
All grid connections in our data5,921st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 431 substations, 406 power plants (113 operating, 1,060 MW), 19 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Radcliffe BSPSubstation——0.2 km
Shore Top Farm, Kearsley Road - Battery Energy StoragePower plant11 MWPermitted0.6 km
Stoneclough - Battery Energy StoragePower plant7 MWPermitted1.0 km
RingleySubstation——1.4 km
Kearsley Local BSPSubstation——1.6 km
Bent Spur Solar FarmPower plant5 MWOperating3.0 km
Evolution @ Agecroft Commerce ParkData center——5.3 km
Joule HouseData center——9.7 km
Asanti ManchesterData center——10 km

Grid operator and place

More from Electricity North West Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page