Grid connection · England, United Kingdom

Port Of Liverpool Wind Farm grid connection

Port Of Liverpool Wind Farm grid connection is a grid connection in England, United Kingdom, with 15 MW of capacity, held by Wind Port of Liverpool Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Bootle GT1 / Litherland GT1A)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWind Port of Liverpool LimitedSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity15 MWSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSP ManwebSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date11 Jan 2009SP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Energy Networks open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Port Of Liverpool Wind Farm grid connection is the 1,192nd-largest of 2,533 grid connections in England and the 1,890th-largest of 3,903 in the United Kingdom by capacity; its 15 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,192nd of 2,533319,370 MW<0.1%
United Kingdom1,890th of 3,903446,745 MW<0.1%
All grid connections in our data5,701st of 7,9281,372,494 MW<0.1%

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page