Power plant · Sefton, England, United Kingdom

Alexandra Dock

Alexandra Dock is a cancelled power plant in Sefton, England, United Kingdom, with 30 MW of capacity, operated by Innovative Environmental Solutions UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSefton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAlexandra Branch Dock 1 Regent Road BootleDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Feb 2010 (permit S/2009/0640, Town and Country Planning Act, issued by Sefton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Aug 2009 (reference S/2009/0640, planning authority Sefton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Feb 2010 (granted, reference S/2009/0640, planning authority Sefton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInnovative Environmental Solutions UK LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAdvanced Conversion TechnologiesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4486, -3.0024DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Sefton, reference S/2009/0640)
  3. Permit applied for (planning authority Sefton, reference S/2009/0640)

How it compares

Alexandra Dock is the 386th-largest of 3,430 power plants in England and the 727th-largest of 5,050 in the United Kingdom by capacity; its 30 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England386th of 3,43071,965 MW<0.1%
United Kingdom727th of 5,050115,622 MW<0.1%
All power plants in our data2,805th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 200 grid connections (123 operating, 1,177 MW), 187 substations, 11 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten Edge Data Centre LiverpoolData center——12 km
Bickerstaffe WTW grid connectionGrid connection1.25 MWOperating12 km
OrmskirkSubstation——15 km
ScarisbrickSubstation——18 km
Washway Farm / Kirkby GSPSubstation——18 km
Halsalls Lodge grid connectionGrid connection119 MWPlanned18 km
Washway Farm BESS VAR1 grid connectionGrid connection85 MWPlanned18 km
The Babbage CentreData center——23 km
nLighten ChesterData center——23 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom