RARE CONTEXT Request research

Grid connection · England, United Kingdom

Origin Business Park grid connection

Origin Business Park grid connection is a planned grid connection in England, United Kingdom, with 3.4 MW of capacity, held by Segro.

Map: where Origin Business Park grid connection lies
51.5314, -0.2790 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Gibbons Rd 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderSegroUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toGibbons Rd 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity3.4 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorLondon Power Networks plc (UK Power Networks, London licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date18 Jan 2023UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.5314, -0.2790UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Origin Business Park grid connection is the 2,699th-largest of 3,539 grid connections in England and the 3,716th-largest of 4,870 in the United Kingdom by capacity; its 3.4 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,699th of 3,539341,715 MW<0.1%
United Kingdom3,716th of 4,870467,981 MW<0.1%
All grid connections in our data7,437th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 604 substations, 377 power plants (134 operating, 3,523 MW), 159 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Equinix LD3Data center——0.3 km
Data center, England (OSM way 27618478)Data center——0.4 km
Park Royal PrimarySubstation——0.9 km
Premier Park Road - Photovoltaic SystemPower plant1.44 MWCancelled1.0 km
Unit F, 6, Premier Park Road - Solar PanelsPower plant1.31 MWCancelled1.0 km
Beresford Av Primary 11kVSubstation——1.2 km
Options Park Royal Data CentreData center——1.3 km
Acton Lane BSPSubstation——1.4 km
WillesdenPower plant2 MWCancelled2.1 km

Holder, grid operator and place

More from Segro

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page