Power plant · Brent, England, United Kingdom

Premier Park Road - Photovoltaic System

Premier Park Road - Photovoltaic System is a cancelled solar power plant in Brent, England, United Kingdom, with 1.44 MW of capacity, operated by Segro UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBrent (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit D, Premier Park Road, Brent, NW10 7NZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 May 2022 (permit 22/1064, Town and Country Planning Act, issued by Brent)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Mar 2022 (reference 22/1064, planning authority Brent)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 May 2022 (granted, reference 22/1064, planning authority Brent)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSegro UK (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.44 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5370, -0.2685DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Brent, reference 22/1064)
  2. Permit applied for (planning authority Brent, reference 22/1064)

How it compares

Premier Park Road - Photovoltaic System is the 3,681st-largest of 4,036 power plants in England and the 5,377th-largest of 5,837 in the United Kingdom by capacity; its 1.44 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,681st of 4,036134,406 MW<0.1%
United Kingdom5,377th of 5,837200,833 MW<0.1%
All power plants in our data12,189th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 156 data centers (1 operating, 88 MW), 139 substations, 48 grid connections (29 operating, 313 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Options Park Royal Data CentreData center——0.6 km
Acton Lane BSPSubstation——0.7 km
Vantage LHR2Data center——0.8 km
Canal Bank 11kV PrimarySubstation——0.8 km
Canal Bank 6.6kV PrimarySubstation——0.8 km
Colt London WestData center——0.9 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating4.6 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned8.8 km
North Hyde Sub STN grid connectionGrid connection9.5 MWOperating11 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom