Data center · England, United Kingdom
Equinix LD3
Equinix LD3 is a data center in England, United Kingdom, operated by Equinix, Inc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | London, NW10 7PH | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Equinix, Inc. | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 2,690 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.5289, -0.2778 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Equinix, Inc. operates 13 of the 191 data centers in the United Kingdom in our data with a named owner; the most of any owner. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United Kingdom | Rank | Data centers | Share |
|---|---|---|---|
| Equinix, Inc. | 1st | 13 | 6.8% |
| Digital Realty | 2nd | 10 | 5.2% |
| Virtus | 2nd | 10 | 5.2% |
| Pulsant | 4th | 8 | 4.2% |
| NTT Limited | 5th | 6 | 3.1% |
Nearby
Within 50 km of this data center: 367 power plants (127 operating, 1,969 MW), 141 substations, 50 grid connections (31 operating, 321 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Park Royal Primary | Substation | — | — | 0.6 km |
| Premier Park Road - Photovoltaic System | Power plant | 1.44 MW | Permitted | 1.1 km |
| Unit F, 6, Premier Park Road - Solar Panels | Power plant | 1.31 MW | Permitted | 1.1 km |
| Leamington Park Primary | Substation | — | — | 1.4 km |
| Acton Lane BSP | Substation | — | — | 1.4 km |
| Willesden | Power plant | 2 MW | Cancelled | 2.0 km |
| Ariel Way White City London grid connection | Grid connection | 2.2 MW | Operating | 4.6 km |
| Brentford F C Training Ground 100 grid connection | Grid connection | 120 MW | Planned | 7.7 km |
| North Hyde Sub STN grid connection | Grid connection | 9.5 MW | Operating | 11 km |
Operator and place
More from Equinix, Inc.
- Equinix AM1data center
- Equinix MA1data center
- Equinix MA4data center
- Equinix Amsterdam AM5data center
- Equinix AM6data center
- Equinix Helsinki HE3data center
- Equinix Helsinki HE4data center
- Equinix MU1data center
Other data centers in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.