Substation · England, United Kingdom

Park Royal Primary

Park Royal Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom0 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom12.3 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers2 x 10 / 11.5MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromActon Lane BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromWillesden GSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementReplace both transformers with 20 / 40MVA units and uprate the substation from 6.6kV to 11kV (completion: Jun-29)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)Full (rag: Red, constraint: Substation Thermal Capacity & Upstream Thermal Capacity)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (rag: Red, constraint: Substation Fault Level)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage22 kV (levels kv: 22,6.6)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5261, -0.2696SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 362 power plants (123 operating, 1,953 MW), 49 grid connections (30 operating, 320 MW), 1 transmission line and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Premier Park Road - Photovoltaic SystemPower plant1.44 MWPermitted1.2 km
Unit F, 6, Premier Park Road - Solar PanelsPower plant1.31 MWPermitted1.2 km
WillesdenPower plant2 MWCancelled1.6 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating3.9 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned8.0 km
North Hyde Sub STN grid connectionGrid connection9.5 MWOperating11 km
North London (Electricity Line) ReinforcementTransmission line—Permitted18 km
SDC M40 CampusData center—Planned23 km

Grid operator and place

More from Southern Electric Power Distribution plc

Other substations in England

All 1215 substations in England, United Kingdom

Data on this page