Grid connection · England, United Kingdom
Offham Quarry grid connection
Offham Quarry grid connection is a grid connection in England, United Kingdom, with 9.5 MW of capacity, held by Infinis Solar Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Wrotham Heath 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Infinis Solar Ltd | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Wrotham Heath 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Offham Landfill Site - Solar PV Array (matched by shared name+coordinates+technology+capacity+company, 0.56 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 9.5 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Solar | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | South Eastern Power Networks plc (UK Power Networks, South East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 24 Nov 2022 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.2880, 0.3626 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Construction started: Offham Landfill Site - Solar PV Array
- Permit granted: Offham Landfill Site - Solar PV Array (planning authority Tonbridge and Malling, reference KCC/TM/0090/2021)
- Permit applied for: Offham Landfill Site - Solar PV Array (planning authority Tonbridge and Malling, reference KCC/TM/0090/2021)
How it compares
Offham Quarry grid connection is the 1,895th-largest of 3,539 grid connections in England and the 2,663rd-largest of 4,870 in the United Kingdom by capacity; its 9.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,895th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,663rd of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,312th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 420 substations, 333 power plants (128 operating, 7,236 MW), 60 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Offham Landfill Site Phase II | Power plant | 1.2 MW | Operating | 0.5 km |
| Offham Landfill Site - Solar PV Array | Power plant | 10.2 MW | Under construction | 0.6 km |
| Blaise Farm (Farm AD) | Power plant | 5 MW | Cancelled | 1.7 km |
| Wrotham Heath 11kV | Substation | — | — | 2.5 km |
| Mereworth 11kV | Substation | — | — | 3.7 km |
| Townsend Hook 6.6kV | Substation | — | — | 7.4 km |
| CXD Infrastructure Solutions | Data center | — | — | 13 km |
| CustodianDC Maidstone | Data center | — | — | 13 km |
| CustodianDC DA2 | Data center | — | — | 20 km |
Holder, grid operator and place
More from Infinis Solar Ltd
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.