Power plant · Tonbridge and Malling, England, United Kingdom

Offham Landfill Site Phase II

Offham Landfill Site Phase II is a power plant in Tonbridge and Malling, England, United Kingdom, with 1.2 MW of capacity, operated by Waste Recycling Group plc and ARC Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTonbridge and Malling (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand to Rear of White Ladies Teston Road, Offham, West Malling, KentDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1996DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Aug 1995 (Town and Country Planning Act, issued by Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Mar 1994 (planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Aug 1995 (granted, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaste Recycling Group plc (ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorARC Ltd (ARC Ltd (Greenways Landfill)/ Waste Recycling Group plc)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2922, 0.3626DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Offham Landfill Site Phase II is the 3,211th-largest of 3,430 power plants in England and the 4,760th-largest of 5,050 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,211th of 3,43071,985 MW<0.1%
United Kingdom4,760th of 5,050115,642 MW<0.1%
All power plants in our data11,509th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act)
  2. Started operating

Nearby

Within 50 km of this power plant: 60 data centers, 3 grid connections (2 operating, 9.14 MW), 3 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——13 km
CustodianDC MaidstoneData center——13 km
CustodianDC DA2Data center——19 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating30 km
Tertiary Study grid connectionGrid connection57 MWPlanned40 km
North London (Electricity Line) ReinforcementTransmission line—Permitted45 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating47 km
Harvard lane PrimarySubstation——49 km
Goldsmiths PrimarySubstation——49 km