Grid connection · England, United Kingdom

NGED Export Increase grid connection

NGED Export Increase grid connection is a planned grid connection in England, United Kingdom, with 16.5 MW of capacity, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceNGED EXPORT INCREASE grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Yeovil)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toYeovil BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity16.5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date5 Aug 2026SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date5 Aug 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.9500, -2.6073SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

NGED Export Increase grid connection is the 1,158th-largest of 2,533 grid connections in England and the 1,834th-largest of 3,903 in the United Kingdom by capacity; its 16.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,158th of 2,533319,370 MW<0.1%
United Kingdom1,834th of 3,903446,745 MW<0.1%
All grid connections in our data5,630th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 329 power plants (152 operating, 922 MW), 62 substations, 2 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Yeovil BSPSubstation——0.2 km
Yeovil PrimarySubstation——0.3 km
West Hendford PrimarySubstation——2.8 km
Clifton FarmPower plant35 MWOperating4.7 km
Chilton Cantelo Solar FarmPower plant5 MWOperating5.0 km
Camp Road, West Coker - Solar PV PanelsPower plant15.2 MWPermitted5.9 km
Tata Communications Highbridge DatacentreData center——40 km
Hinkley Point C ConnectionTransmission line—Permitted44 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned46 km