Power plant · Brentwood, England, United Kingdom

Ongar Landfill Ground mounted solar photovoltaic

Ongar Landfill Ground mounted solar photovoltaic is a cancelled power plant in Brentwood, England, United Kingdom, with 8.8 MW of capacity, operated by Infinis.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBrentwood (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressOngar Landfill, Mill Lane, High Ongar, CM5 9RGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Feb 2021 (reference ESS/21/21/BRW, planning authority Brentwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Sept 2021 (withdrawn, reference ESS/21/21/BRW, planning authority Brentwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinisDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6968, 0.2629DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Brentwood, reference ESS/21/21/BRW)
  2. Permit applied for (planning authority Brentwood, reference ESS/21/21/BRW)

How it compares

Ongar Landfill Ground mounted solar photovoltaic is the 1,288th-largest of 3,430 power plants in England and the 2,104th-largest of 5,050 in the United Kingdom by capacity; its 8.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,288th of 3,43071,965 MW<0.1%
United Kingdom2,104th of 5,050115,622 MW<0.1%
All power plants in our data7,516th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 76 data centers (1 operating, 88 MW), 25 substations, 4 grid connections (2 operating, 9.14 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
NVIDIA Cambridge-1AI supercomputer202 H100eOperating12 km
Kao Data KLON-01Data center——12 km
Kao Data KLON-02Data center——12 km
NTT London 1Data center——18 km
North London (Electricity Line) ReinforcementTransmission line—Permitted24 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating26 km
Tertiary Study grid connectionGrid connection57 MWPlanned31 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating40 km
Willesden GSPSubstation——40 km

Operator and place

More from Infinis

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page