RARE CONTEXT Request research

Grid connection · England, United Kingdom

Luton Road grid connection

Luton Road grid connection is a grid connection in England, United Kingdom, with 49.5 MW of capacity, held by ReThink Energy Limited.

Map: where Luton Road grid connection lies
51.9273, -0.4975 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Sundon 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderReThink Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toChapel Farm (matched by coordinates+technology+capacity, 0.12 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity49.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date14 Apr 2023UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.9273, -0.4975UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Chapel Farm
  2. Permit granted: Chapel Farm (planning authority Central Bedfordshire, reference CB/18/01795/FULL)
  3. Permit applied for: Chapel Farm (planning authority Central Bedfordshire, reference CB/18/01795/FULL)

How it compares

Luton Road grid connection is the 803rd-largest of 3,539 grid connections in England and the 1,139th-largest of 4,870 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England803rd of 3,539341,715 MW<0.1%
United Kingdom1,139th of 4,870467,981 MW<0.1%
All grid connections in our data4,333rd of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 447 power plants (162 operating, 3,783 MW), 312 substations, 85 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chapel FarmPower plant49.5 MWOperating0.1 km
Sundon 33kVSubstation——0.3 km
Sundon SubstationPower plant49.9 MWOperating0.5 km
Sundon Primary 11kV T1&T2Substation——0.6 km
Sundon Primary 11kV T3&T4Substation——0.6 km
Sundon Sub Station Battery Storage FacilityPower plant50 MWCancelled0.6 km
Data center, Dunstable (OSM way 526426719)Data center——3.3 km
NTT Hemel Hempstead 2Data center——18 km
NTT Hemel Hempstead 3Data center——19 km

Holder, grid operator and place

More from ReThink Energy Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page