ReThink Energy Limited is linked to 3 assets and rights in the United Kingdom: it holds 2 grid connections and is the applicant for a power plant (never built).

Portfolio

The 3 assets and rights ReThink Energy Limited owns, operates or holds, by class, with its role in each, across its 2 records. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.

Grid connections 2

Grid connectionLocationRoleCapacity
Bumpers Farm Ilmer Bucks grid connectionEngland, United KingdomHolder49.5 MW
Luton Road grid connectionEngland, United KingdomHolder49.5 MW

Power plants 1

Power plantLocationRoleCapacity
Hall Farm and Field Barn FarmBreckland, England, United KingdomApplicant34 MW

By country

Where the assets and rights are.

Latest events

Dated events about ReThink Energy Limited and its assets from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit refused: Hall Farm and Field Barn Farm (planning authority Breckland, reference 3PL/2014/0589/F)
  2. Permit applied for: Hall Farm and Field Barn Farm (planning authority Breckland, reference 3PL/2014/0589/F)

Partners and counterparties

Owners, operators and grid operators on the same assets.

Also recorded as

Sources name ReThink Energy Limited under 2 records; this page joins them. Links to any of them lead here.

Name in the sourceIdentifierSource
ReThink Energy Limitedparty:name:rethink-energy-limitedUK Power Networks open data portal
Rethink Energyparty:name:rethink-energyDESNZ Renewable Energy Planning Database (REPD)

Research on ReThink Energy Limited.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.