Luton Airport Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 7.3 MVA of demand headroom and 39.4 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Luton Airport Primary 11kV lies
51.8860, -0.3778 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom7.3 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom39.4 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity23.9 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8860, -0.3778UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 422 power plants (150 operating, 3,647 MW), 310 grid connections (201 operating, 1,966 MW), 122 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
(ANM) Darley Road grid connectionGrid connection35 MWPlanned1.6 km
Ld At Lawrence End Park &, Dane StreetPower plant5 MWOperating2.1 km
Wandon End - Solar Farm & Battery StoragePower plant49.9 MWPermitted2.4 km
Chiltern Green RoadPower plant10 MWCancelled3.0 km
Lilley Bottom grid connectionGrid connection30 MWPlanned3.4 km
Lawrence End Park grid connectionGrid connection10 MWOperating3.6 km
Data center, Dunstable (OSM way 526426719)Data center——8.6 km
BT Computer CentreData center——13 km
NTT Hemel Hempstead 2Data center——14 km