Grid connection · England, United Kingdom
Lascar Works grid connection
Lascar Works grid connection is a grid connection in England, United Kingdom, with 20 MW of capacity, connected by Electricity North West.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | LASCAR WORKS grid connection | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Bury) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Bury BSP (via a bulk supply point) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Lascar Works (matched by name+coordinates+technology+capacity, 0.29 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 20 MW | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Electricity North West | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 1 May 2019 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 53.5961, -2.2944 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Commissioned: Lascar Works
- Permit granted: Lascar Works (planning authority Bury, reference 62215)
- Permit applied for: Lascar Works (planning authority Bury, reference 62215)
How it compares
Lascar Works grid connection is the 1,020th-largest of 2,533 grid connections in England and the 1,645th-largest of 3,903 in the United Kingdom by capacity; its 20 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,020th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,645th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,244th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 455 substations, 400 power plants (116 operating, 2,928 MW), 18 data centers, 2 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bury BSP | Substation | — | — | 0.2 km |
| Chamberhall | Substation | — | — | 0.3 km |
| Lascar Works | Power plant | 20 MW | Operating | 0.3 km |
| Bury Town Centre | Substation | — | — | 0.5 km |
| Pilsworth Landfill Site | Power plant | 5 MW | Operating | 2.7 km |
| Pilsworth Quarry Landfill Scheme | Power plant | 4.1 MW | Operating | 2.9 km |
| Evolution @ Agecroft Commerce Park | Data center | — | — | 9.8 km |
| Asanti Manchester | Data center | — | — | 14 km |
| Joule House | Data center | — | — | 14 km |
Grid operator and place
More from Electricity North West
- The Albion Academy grid connection416 MW
- Heaten Hall Farm BESS grid connection240 MW
- Heaten Hall Farm BESS+Wind grid connection240 MW
- Houghton BESS grid connection240 MW
- Walney 2 Offshore Wind Farm grid connection183 MW
- Bolton Road grid connection179 MW
- WS Lamb 2 grid connection160 MW
- Ormonde Offshore Windfarm grid connection150 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.