Grid connection · England, United Kingdom

Land to the East of Marchwood Bypass grid connection

Land to the East of Marchwood Bypass grid connection is a planned grid connection in England, United Kingdom, with 49.9 MW of capacity, held by GridSource Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLAND TO THE EAST OF MARCHWOOD BYPASS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Nursling GSP)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderGridSource LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toNursling GSP (via a grid supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toBulls Copse Road, Marchwood Bypass - Battery Energy Storage System (matched by shared name+coordinates+technology+capacity, 0.2 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity49.9 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date7 Jul 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2037 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates50.9001, -1.4738SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System (planning authority New Forest, reference 25/10640)
  2. Permit applied for: Bulls Copse Road, Marchwood Bypass - Battery Energy Storage System (planning authority New Forest, reference 25/10640)

How it compares

Land to the East of Marchwood Bypass grid connection is the 597th-largest of 2,533 grid connections in England and the 904th-largest of 3,903 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England597th of 2,533319,370 MW<0.1%
United Kingdom904th of 3,903446,745 MW<0.1%
All grid connections in our data4,270th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 237 power plants (107 operating, 1,054 MW), 188 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Bulls Copse Road, Marchwood Bypass - Battery Energy Storage SystemPower plant49.9 MWPermitted0.2 km
Land South of Bury RoadPower plant4 MWCancelled0.8 km
Durley FarmPower plant6.7 MWCancelled1.0 km
Marchwood PrimarySubstation——2.1 km
Totton PrimarySubstation——2.5 km
Regents Park PrimarySubstation——2.8 km
Sky ChilworthData center——7.6 km
Regit4uData center——16 km
SCCData center——16 km

Holder, grid operator and place

More from GridSource Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page