Substation · England, United Kingdom
Nursling GSP
Nursling GSP is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (rag: Green) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (rag: Red, constraint: Substation Thermal Capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 3 x 240MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Gsp | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 400/132 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Replace the 132kV board with 40kA break / 100kA make switchgear (completion: Feb-31) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.9409, -1.4880 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 218 grid connections (123 operating, 1,148 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| BUTTS Field Energy Storage grid connection | Grid connection | 99 MW | Planned | 0.5 km |
| Gerard Hall Battery Site grid connection | Grid connection | 50 MW | Planned | 0.5 km |
| SHB Hire Ltd grid connection | Grid connection | 50 MW | Planned | 0.5 km |
Grid operator and place
Upstream substation
- Rownhams BSP
- Southampton (Main) BSP
- Southampton (Reserve) BSP
- Velmore BSP
- Winchester BSP
- Marchwood Primary
- Fletchwood Primary
- Lordshill Primary
- Maybush Primary
- North Baddesley Primary
- Romsey Primary
- Silkstead Primary
- Totton Primary
- Regents Park Primary
- Shirley Primary
- Western Esplanade Primary
- Woodmill Lane Primary
- Bevois Valley Primary
- Central Bridge Primary
- Chapel Primary
- Bassett Primary
- Bishopstoke Primary
- Chandlers Ford Primary
- Eastleigh North Primary
- Hedge End Primary
- Velmore Primary
- Dunbridge Primary
- Gordon Road Primary
- Harestock Primary
- Houghton Primary
- St Cross Primary
Grid connections attached to this substation
- 49.9MW Battery grid connection49.9 MW
- BUTTS Field Energy Storage grid connection99 MW
- Ft Woodington Farm PV grid connection40 MW
- Gerard Hall Battery Site grid connection50 MW
- Land to the East of Marchwood Bypass grid connection49.9 MW
- Ocean Gate grid connection5.99 MW
- Solar 47.5 MW grid connection at Eveley PV47.5 MW
- PV/BESS - 50MW grid connection49.9 MW
- SHB Hire Ltd grid connection50 MW
- Weston Lane (G) grid connection450 MW
- Wherwell Solar Farm grid connection32.4 MW
More from Southern Electric Power Distribution plc
- Amersham GSPsubstation
- Loudwater BSPsubstation
- Bowerdean Primarysubstation
- Flackwell Heath Primarysubstation
- Well End Primarysubstation
- Wycombe Marsh Primarysubstation
- Axminster GSPsubstation
- Yeovil BSPsubstation
Other substations in England
Data on this page
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.