Green Tye grid connection

Green Tye grid connection is a grid connection in England, United Kingdom, with 1.8 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Green Tye grid connection lies
51.8459, 0.0919 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Much Hadham Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toMuch Hadham Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity1.8 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date24 Feb 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8459, 0.0919UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Green Tye grid connection is the 3,106th-largest of 3,539 grid connections in England and the 4,304th-largest of 4,870 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,106th of 3,539341,715 MW<0.1%
United Kingdom4,304th of 4,870467,981 MW<0.1%
All grid connections in our data8,039th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 461 substations, 429 power plants (154 operating, 5,710 MW), 75 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Nurseries, Green TyePower plant1.2 MWOperating0.2 km
Much Hadham Primary 11kVSubstation——2.2 km
Thorley Primary 11kVSubstation——4.4 km
Newtown Primary 11kVSubstation——4.8 km
Wickham Hall Estate - Battery StoragePower plant10 MWPermitted5.4 km
Wickham Hall Estate Solar Photovoltaic FarmPower plant20 MWPermitted5.4 km
Kao Data KLON-02Data center——8.8 km
Kao Data KLON-01Data center——8.9 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating8.9 km