Power plant · Uttlesford, England, United Kingdom

Wickham Hall Estate Solar Photovoltaic Farm

Wickham Hall Estate Solar Photovoltaic Farm is a permitted power plant in Uttlesford, England, United Kingdom, with 20 MW of capacity, operated by Endurance Energy Wickham Hall Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUttlesford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe North-West Of Bishops Stortford Farnham Road Farnham, CM23 1HZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date13 Sept 2024 (permit UTT/24/1417/PINS, Town and Country Planning Act, issued by Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jun 2024 (reference UTT/24/1417/PINS, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date13 Sept 2024 (granted, reference UTT/24/1417/PINS, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEndurance Energy Wickham Hall LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area32.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8883, 0.1303DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Wickham Hall Estate Solar Photovoltaic Farm is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 70 data centers (1 operating, 88 MW), 10 substations, 3 grid connections (2 operating, 9.14 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kao Data KLON-02Data center——13 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating13 km
Kao Data KLON-01Data center——13 km
Hertfordshire Data CentreData center——24 km
North London (Electricity Line) ReinforcementTransmission line—Permitted34 km
Tertiary Study grid connectionGrid connection57 MWPlanned44 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating44 km
Willesden GSPSubstation——47 km
Canal Bank 11kV PrimarySubstation——48 km

Operator and place

More from Endurance Energy Wickham Hall Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page