Grid connection · England, United Kingdom
31 Burrettgate Road grid connection
31 Burrettgate Road grid connection is a planned grid connection in England, United Kingdom, with 200 MW of capacity, held by Walsoken Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Walpole) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Walsoken Limited | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Walsoken, Burrettgate Road - Battery Storage Facility (matched by shared name+coordinates+technology+capacity+company, 0.24 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 200 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Battery storage | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 13 Jul 2022 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 132 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.6665, 0.1887 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Permit granted: Walsoken, Burrettgate Road - Battery Storage Facility (planning authority King's Lynn and West Norfolk, reference 23/02302/FM)
- Permit applied for: Walsoken, Burrettgate Road - Battery Storage Facility (planning authority King's Lynn and West Norfolk, reference 23/02302/FM)
How it compares
31 Burrettgate Road grid connection is the 245th-largest of 3,539 grid connections in England and the 328th-largest of 4,870 in the United Kingdom by capacity; its 200 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 245th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 328th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 1,910th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 304 power plants (121 operating, 4,016 MW), 76 substations, 5 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Walsoken, Burrettgate Road - Battery Storage Facility | Power plant | 200 MW | Permitted | 0.2 km |
| Walsoken Grid 11kV | Substation | — | — | 0.6 km |
| Walsoken Grid 33kV | Substation | — | — | 0.6 km |
| Wisbech Railway Primary 11kV | Substation | — | — | 2.2 km |
| Meerdyke Solar Panels & Battery Storage | Power plant | 49.9 MW | Permitted | 2.8 km |
| Medworth EfW | Power plant | 58 MW | Permitted | 3.0 km |
| Positive Park | Data center | — | — | 13 km |
| Longmarsh Green Energy | Data center | — | Planned | 13 km |
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 14 km |
Holder, grid operator and place
More from Walsoken Limited
- Walsoken, Burrettgate Road - Battery Storage Facility200 MW · permitted
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.