Grid connection · England, United Kingdom

Green Ilmer grid connection

Green Ilmer grid connection is a grid connection in England, United Kingdom, with 4.2 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Green Ilmer grid connection lies
51.7487, -0.8915 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Ilmer Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toBumpers Farm Phase 1 (matched by coordinates+technology+capacity, 0.12 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity4.2 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date20 Mar 2017UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7487, -0.8915UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Bumpers Farm Phase 1
  2. Permit granted: Bumpers Farm Phase 1 (appeal granted, planning authority Buckinghamshire, reference 14/01926/APP)
  3. Permit granted: Bumpers Farm Phase 1 (planning authority Buckinghamshire, reference 14/01926/APP)
  4. Permit refused: Bumpers Farm Phase 1 (planning authority Buckinghamshire, reference 14/01926/APP)
  5. Permit applied for: Bumpers Farm Phase 1 (planning authority Buckinghamshire, reference 14/01926/APP)

How it compares

Green Ilmer grid connection is the 2,498th-largest of 3,539 grid connections in England and the 3,471st-largest of 4,870 in the United Kingdom by capacity; its 4.2 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,498th of 3,539341,715 MW<0.1%
United Kingdom3,471st of 4,870467,981 MW<0.1%
All grid connections in our data7,180th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 394 power plants (139 operating, 3,623 MW), 329 substations and 97 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ilmer Primary 11kVSubstation——0.1 km
Bumpers Farm Phase 1Power plant5 MWOperating0.1 km
Bumpers Farm Phase 2Power plant12 MWCancelled0.1 km
Bumpers Lane Solar FarmPower plant13.3 MWOperating0.5 km
Ilmer Grid 33kVSubstation——0.7 km
Thame Primary 11kVSubstation——4.8 km
Data center, England (OSM way 1460602301)Data center—Under construction8.6 km
Data center, England (OSM way 1254986167)Data center——16 km
CapitaLand Ascendas REIT data center, High WycombeData center——16 km

Grid operator and place