Power plant · Buckinghamshire, England, United Kingdom

Bumpers Farm Phase 1

Bumpers Farm Phase 1 is a solar power plant in Buckinghamshire, England, United Kingdom, with 5 MW of capacity, operated by Solar Planning.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP17 8DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Oct 2015 (permit 14/01926/APP, Town and Country Planning Act, issued by Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jul 2014 (reference 14/01926/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Sept 2014 (refused, reference 14/01926/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Oct 2015 (appeal granted, reference 14/01926/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Oct 2015 (granted, reference 14/01926/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolar PlanningDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area50 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7487, -0.8933DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (appeal granted, planning authority Buckinghamshire, reference 14/01926/APP)
  3. Permit granted (planning authority Buckinghamshire, reference 14/01926/APP)
  4. Permit refused (planning authority Buckinghamshire, reference 14/01926/APP)
  5. Permit applied for (planning authority Buckinghamshire, reference 14/01926/APP)

How it compares

Bumpers Farm Phase 1 is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 201 substations, 153 grid connections (70 operating, 792 MW) and 95 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Lewknor Solar grid connectionGrid connection49.9 MWPlanned8.7 km
Data center, England (OSM way 1460602301)Data center—Under construction8.7 km
Rycote Farm grid connectionGrid connection47.5 MWPlanned9.8 km
Stokenchurch PrimarySubstation——12 km
Harlesford Solar Farm grid connectionGrid connection20 MWPlanned13 km
Watlington PrimarySubstation——14 km
Fryers Lane PrimarySubstation——15 km
Data center, England (OSM way 1254986167)Data center——16 km
CapitaLand Ascendas REIT data center, High WycombeData center——16 km

Operator and place

More from Solar Planning

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page