Grid connection · England, United Kingdom
Gas 7 MW grid connection at Stourton 132/11kV Direct
Gas 7 MW grid connection at Stourton 132/11kV Direct is a grid connection in England, United Kingdom, with 7 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Stourton 132/11kV Direct) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Skelton Grange (via a grid supply point) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 7 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Gas | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Yorkshire) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 20 Oct 2016 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 30 Jun 2019 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 53.7672, -1.4989 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its grid operator? Ask us.
How it compares
Gas 7 MW grid connection at Stourton 132/11kV Direct is the 1,504th-largest of 2,533 grid connections in England and the 2,368th-largest of 3,903 in the United Kingdom by capacity; its 7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,504th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,368th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 6,005th of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Connected
Nearby
Within 50 km of this grid connection: 397 power plants (105 operating, 4,015 MW), 364 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Stourton 33/11kV | Substation | — | — | 0.3 km |
| Stourton 132/11kV Direct | Substation | — | — | 0.4 km |
| Skelton Grange – Energy Recovery Facility | Power plant | 49 MW | Under construction | 1.1 km |
| Skelton Grange | Substation | — | — | 1.3 km |
| Skelton Grange Battery Storage Facility | Power plant | 99 MW | Permitted | 1.5 km |
| Knostrop WWTW AD | Power plant | 2.4 MW | Operating | 1.5 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 21 km |
Grid operator and place
More from Northern Powergrid (Yorkshire) plc
- Battery storage and Solar and Wind 394.6 MW grid connection at Elm Tree Hybrid Direct395 MW
- Solar 320 MW grid connection at Creyke Beck Solar Direct320 MW
- Battery storage and Solar and Wind 299.7 MW grid connection at Little Becks Hybrid Direct300 MW
- Wind 240 MW grid connection at Calderdale Wind Farm Direct240 MW
- Battery storage 240 MW grid connection at NEL Conway2 BESS Direct240 MW
- Battery storage 240 MW grid connection at NEL Suggit BESS Direct240 MW
- Springfield Farm grid connection240 MW
- Springfield Farm grid connection240 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.