Grid connection · England, United Kingdom

Gas 7 MW grid connection at Stourton 132/11kV Direct

Gas 7 MW grid connection at Stourton 132/11kV Direct is a grid connection in England, United Kingdom, with 7 MW of capacity, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Stourton 132/11kV Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSkelton Grange (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity7 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date20 Oct 2016Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Jun 2019Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.7672, -1.4989Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Gas 7 MW grid connection at Stourton 132/11kV Direct is the 1,504th-largest of 2,533 grid connections in England and the 2,368th-largest of 3,903 in the United Kingdom by capacity; its 7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,504th of 2,533319,370 MW<0.1%
United Kingdom2,368th of 3,903446,745 MW<0.1%
All grid connections in our data6,005th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 397 power plants (105 operating, 4,015 MW), 364 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Stourton 33/11kVSubstation——0.3 km
Stourton 132/11kV DirectSubstation——0.4 km
Skelton Grange – Energy Recovery FacilityPower plant49 MWUnder construction1.1 km
Skelton GrangeSubstation——1.3 km
Skelton Grange Battery Storage FacilityPower plant99 MWPermitted1.5 km
Knostrop WWTW ADPower plant2.4 MWOperating1.5 km
Yorkshire GREENTransmission line—Permitted21 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page