Grid connection · England, United Kingdom
Eco Parley Generation grid connection
Eco Parley Generation grid connection is a planned grid connection in England, United Kingdom, with 8.69 MW of capacity, held by Eco Sustainable Solutions.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | ECO PARLEY GENERATION grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Parley Hub PV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Eco Sustainable Solutions | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Redhill BSP (via a bulk supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 8.69 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 13 Sept 2021 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 31 Oct 2027 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.7905, -1.8592 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchHow it compares
Eco Parley Generation grid connection is the 1,415th-largest of 2,533 grid connections in England and the 2,240th-largest of 3,903 in the United Kingdom by capacity; its 8.69 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,415th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 2,240th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 6,167th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 256 power plants (116 operating, 981 MW), 156 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Chapel Lane Parley Solar Farm Phase 1 | Power plant | 20 MW | Operating | 0.2 km |
| Parley Renewable Energy Park (PV) | Power plant | 5 MW | Cancelled | 0.5 km |
| Parley Renewable Energy Park (AD) | Power plant | 1 MW | Cancelled | 0.6 km |
| Redhill BSP | Substation | — | — | 3.2 km |
| Redhill Primary | Substation | — | — | 3.2 km |
| Ferndown Primary | Substation | — | — | 3.8 km |
| Data Vault - Bournemouth BCP01 | Data center | — | — | 7.7 km |
| Sky Chilworth | Data center | — | — | 36 km |
| SCC | Data center | — | — | 44 km |
Holder, grid operator and place
More from Eco Sustainable Solutions
- Chapel Lane Parley Solar Farm Phase 236 MW
- Parley Renewable Energy Park (PV)5 MW
- Chapel Lane Parley Solar Farm Phase 34 MW
- Chapel Lane ERF3.4 MW · under construction
- Eco Composting3.2 MW
- Bourne Park AD (AD)1.1 MW
- Parley Renewable Energy Park (AD)1 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. The terms cover every document on caiso.com, the cluster reports included. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.